McQuay MicroTech III Instrukcja Naprawy

Przeglądaj online lub pobierz Instrukcja Naprawy dla Sprzęt rejestrujący McQuay MicroTech III. McQuay MicroTech III Troubleshooting guide Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj

Podsumowanie treści

Strona 1 - MicroTech

Operation & Maintenance DataMicroTech® III Unit Controller for Water Source Heat Pump Units Group: WSHP Part Number:

Strona 2

Page 10 of 28 / OM 931-3Low Pressure ResetThe low pressure switch fault is subject to intelligent reset. If the pressure recovers, it resets three tim

Strona 3 - Contents

OM 931-3 / Page 11 of 28Tenant OverrideNote: It is recommended that the "Occupied Operation" and "Unoccupied Operation – Stand Alone T

Strona 4 - Page 4 of 28 / OM 931-3

Page 12 of 28 / OM 931-3Fan Operation during most Modes, Faults and ShutdownsThe MicroTech III unit controller allows fan operation during most modes,

Strona 5 - OM 931-3 / Page 5 of 28

OM 931-3 / Page 13 of 28Figure 6: MicroTech III Unit Controller LED Status and Faults Troubleshooting ReferenceFlash Yellow LEDRead OutputsCheck Time

Strona 6 - CAUTION

Page 14 of 28 / OM 931-3Troubleshooting the Water Source Heat Pump UnitFigure 7: Troubleshooting Guide - Unit OperationUnitLow voltage, check power s

Strona 7 - General Use and Information

OM 931-3 / Page 15 of 28Microtech® III Unit Controller Interface to External Equipment The MicroTech III unit controller’s thermostat input terminal

Strona 8 - Thermostat Control

Page 16 of 28 / OM 931-3Initial Power upFigure 8: I/O Expansion Board Configuration Jumper TerminalsTable 6: I/O Expansion Board Configuration Jumpe

Strona 9 - Additional Operating Modes

OM 931-3 / Page 17 of 28Three-Speed Fan OperationsTable 7: Three-Speed Fan Continuous Fan Compressor On Electric Heat Space Temp Satised Low Speed

Strona 10 - Page 10 of 28 / OM 931-3

Page 18 of 28 / OM 931-3Second Circuit FaultsWith the addition of the second circuit the fault recovery and reset table has new faults for the second

Strona 11 - Table 2: Faults

OM 931-3 / Page 19 of 28Appendix B MicroTech III Unit Controller with LonWorks® Communication ModuleFor installation and operation information on LonW

Strona 13 - OM 931-3 / Page 13 of 28

Page 20 of 28 / OM 931-3MicroTech III Controller with BACnet® Communication ModuleFor installation and operation information on MicroTech III unit con

Strona 14 - Page 14 of 28 / OM 931-3

OM 931-3 / Page 21 of 28Appendix C – Typical Wiring DiagramsMicroTech III Unit Controller (Standalone) – 208/230/460/575/60Hz/3-Phase Table B 208V

Strona 15 - Appendix A

Page 22 of 28 / OM 931-3MicroTech III Unit Controller with Optional ECM Motor, Desuperheater and I/O Expansion Module – 208/230/265/277/60 Hz/1-Phase

Strona 16 - Initial Power up

OM 931-3 / Page 23 of 28MicroTech III Unit Controller with Optional ECM Motor, Desuperheater, Electric Heat Coil and I/O Expansion Module – 208/230/46

Strona 17 - Multiple Speed Fan Control

Page 24 of 28 / OM 931-3MicroTech III Unit Controller with Optional ECM Motor, Desuperheater, and I/O Expansion Module 208/230/460/60/3-Phase*Drawing

Strona 18 - Second Circuit Faults

OM 931-3 / Page 25 of 28MicroTech III Unit Controller with PSC Motor, Desuperheater and I/O Expansion Module for Hot Gas Reheat Control (Unit Sizes 01

Strona 19 - CAUTION

Page 26 of 28 / OM 931-3Controller ComparisonNote: The Mark IV, MicroTech 2000, Alerton and MicroTech III boards are NOT interchangeable.Table 12: Con

Strona 20

OM 931-3 / Page 27 of 28This page left blank intentionally

Strona 21 - Description

©2012 McQuay International • www.daikinmcquay.com • 800.432.1342 OM 931-3 Page 28 of 28 (5/12)Daikin McQuay Training and DevelopmentNow

Strona 22

OM 931-3 / Page 3 of 28IntroductionThis installation and operation manual covers the Micro-Tech® III unit controller for Daikin McQuay Water Source He

Strona 23

Page 4 of 28 / OM 931-3Table 1: MicroTech III Unit Controller Terminals & Descriptions H1 - 1 24 24 VAC Power Input H1 - 2 C 24 VAC Common

Strona 24 - Module 208/230/460/60/3-Phase

OM 931-3 / Page 5 of 28Figure 1: MicroTech III Unit Controller Terminal Locations

Strona 25

Page 6 of 28 / OM 931-3Initial Power-UpPre start check list:A random start delay time between 180 and 240 seconds is generated at power up.Figure 2:

Strona 26 - Controller Comparison

OM 931-3 / Page 7 of 28General Use and InformationThe MicroTech III unit controller is provided with two drive terminals, R (24VAC), and C (0VAC) that

Strona 27 - OM 931-3 / Page 27 of 28

Page 8 of 28 / OM 931-3Control Outputs {A and IV/PR (H8)}The control outputs are Alarm Fault (A) and Isolation Valve / Pump Request {IV/PR (H8)}. The

Strona 28

OM 931-3 / Page 9 of 28Control Inputs (HP, LP, SLTS, COF, U, E, O)The control inputs are High Pressure (HP), Low Pressure (LP), Suction Line Temperatu

Komentarze do niniejszej Instrukcji

Brak uwag