McQuay M5LCX Dokumentacja Strona 45

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 44
44
M5LCX-2009
Imperial Rigid
6.35 / 1/4” 1.3 0.7
9.52 / 3/8” 1.6 1.0
12.70 / 1/2” 1.9 1.3
15.88 / 5/8” 2.2 1.7
19.05 / 3/4” 2.5 2.0
Pipe Ø, D (mm/in)
A (mm)
C) Piping Connection To The Units
Align the center of the piping and tighten the flare nut sufficiently with fingers
Finally, tighten the flare nut with the torque wrench until the wrench clicks.
Copper tube
Swaging block
D
A
The exact length of pipe protruding from the face of the flare die is determined by the flaring tool. The
table shows the use of an imperial die and rigid die.
Fix the pipe firmly on the flare die. Match the centers of both the flare die and the flaring punch, and
tighten flaring punch fully.
Application Information